B 101 – surface renewal – Luckenwalde bypass

Three kilometres, approx. 51,400 m²

Projekt EIO

Client

Landesbetrieb Straßenwesen Brandenburg

Project volume

EUR 1.16 million

Construction time

03/2018 – 04/2018

The B 101, Luckenwalde bypass, was renewed over a length of more than 3 kilometres. Approx. 51,400 m² of asphalt surface course and asphalt binder course were milled out of the road.
The road was reconstructed with 51,400 m² of asphalt binder course and 51,400 m² of stone mastic asphalt.
Approx. 19,000 m of road markings were also replaced.